Three FILTRONtec filter systems have been successfully installed in the Calle M30 Rio tunnel in Madrid. The systems with a capacity of 50 m³/s and 260 m³/s were installed on behalf of Acciona Infraestructure S.A..

Madrid, Spain
Three FILTRONtec filter systems have been successfully installed in the Calle M30 Rio tunnel in Madrid. The systems with a capacity of 50 m³/s and 260 m³/s were installed on behalf of Acciona Infraestructure S.A..
Client
Acciona Infraestructuras S.A.
Contract award
11.2006
Handover
09.2007
Tunnel opening
Air volume flow
Particle filter: 50 m³/s & 260 m³/s
If you would like to find out more about our solutions, you can contact us directly at any time.
+49(0) 3494 6579132
info@filtrontec.de
