Three FILTRONtec filter systems were successfully installed in the Calle M30 Rio tunnel in Madrid. The system with a capacity of 200 m³/s was installed on behalf of FCC Construcción S.A.

Madrid, Spain
Three FILTRONtec filter systems were successfully installed in the Calle M30 Rio tunnel in Madrid. The system with a capacity of 200 m³/s was installed on behalf of FCC Construcción S.A.
Client
FCC Construcción S.A.
Contract award
07.2006
Handover
01.2008
Tunnel opening
Air volume flow
Particle filter: 200 m³/s
If you would like to find out more about our solutions, you can contact us directly at any time.
+49(0) 3494 6579132
info@filtrontec.de
